10-10-2008, 04:15 PM
Wait a minute, 9600 wool is 22 minutes? Mine did 1500 wool in 8 minutes. That's with 500ms delay in between. I also forgot to mention the part where i combine all the macros i made into one continuous one. It sounds like mine was better. Sometimed i could get away with 350ms but 500 was safer.
Remember when I asked to buy 5 spinning wheels off you? I also had 5 wheels running at once in my small house a long with all the sheep. They all ran at the same time while I was also making bolts off a loom. I used a small delay and I don't remember how long that took to make bolts but it wasn't long at all. The wheels and looms don't even need delays.
That sounded too simple for me to try. I didn't know there was a different item number for wooled sheep. I experimented with automated macro's and couldn't do it. I know EUO is capable of it but I couldn't find the right script.
Remember when I asked to buy 5 spinning wheels off you? I also had 5 wheels running at once in my small house a long with all the sheep. They all ran at the same time while I was also making bolts off a loom. I used a small delay and I don't remember how long that took to make bolts but it wasn't long at all. The wheels and looms don't even need delays.
That sounded too simple for me to try. I didn't know there was a different item number for wooled sheep. I experimented with automated macro's and couldn't do it. I know EUO is capable of it but I couldn't find the right script.