09-15-2008, 12:08 AM
Oh man...thats horrible, i have 130 sheeps plus 5 seconds= 11 minutes
and we already have more 3 to pass it on spining well so 260 wolls plu 3 = 13 min
more 520 yarn to pass in loom (thanks god dont puted delay on it) anyway it take 5/8 min....
11+13+5= near 30 minutes.. ****
30 minutes to do cloth with 130 sheeps...
dont was 20 enought like was before the change??
and we already have more 3 to pass it on spining well so 260 wolls plu 3 = 13 min
more 520 yarn to pass in loom (thanks god dont puted delay on it) anyway it take 5/8 min....
11+13+5= near 30 minutes.. ****
30 minutes to do cloth with 130 sheeps...
dont was 20 enought like was before the change??